Projects
FACT Field Container
CHDN designed and built a Field Network communications room for the relocation and upgrade of existing systems, the room provides a 4 hour back up Power supply to critical systems with generator connection and fail over air-conditioning system.
Grunthal Brewery
Grunthal Brewery, a newly constructed establishment, required a comprehensive fit-out of electrical, data, and security systems. CHDN had the opportunity to take charge of managing and executing this project. The task involved detailed planning and execution, ensuring that all aspects of the brewery’s technical infrastructure were efficiently integrated. From wiring to security installations, CHDN approached each element with precision and expertise. The result is a smoothly operating brewery equipped with modern technology, ready to serve its patrons with quality products in a secure environment.
Straddle Carrier Shore Power Connection
CHDNs client purchased new Hybrid straddle cranes for use on their site. We were tasked with the installation of shore power connection for maintaining power to critical systems during down time.
Provided with a scope of works and an understanding of the requirements of the end product, We worked with site users and Client Management to develop a final design that fits the task.
Service Upgrades
CHDN successfully assisted a client in upgrading their services by tackling the requirements of an existing building. The project involved a comprehensive overhaul, necessitating the relocation and replacement of outdated equipment to align with the building’s intended purpose. Through meticulous planning and execution, CHDN ensured that the upgraded services not only met but exceeded the client’s expectations, enhancing the functionality and efficiency of the building. By modernising the infrastructure and optimising the equipment layout, CHDN contributed to the seamless operation and longevity of the facility, ultimately benefiting the client’s operations and objectives.
Bitumen Plant TopCoat
CHDN actively assisted Topcoat throughout the entirety of establishing and activating their bitumen plant. This included offering extensive assistance during installation, ensuring proper assembly and integration of all components for efficient operation. CHDN closely collaborated with Topcoat during the commissioning phase, ensuring the plant met performance standards and regulatory requirements.
Post-installation, CHDN remains committed to delivering ongoing maintenance services, including regular inspections, repairs, and adjustments to sustain the plant’s optimal functionality. Through continuous support and expertise, CHDN strives to ensure Topcoat’s bitumen plant remains operational and productive.

Shop Fit-Out
CHDN seized the opportunity to undertake a transformative project: a comprehensive fast food kitchen fit-out for a prominent burger bar nestled within Adelaide University. Recognising the significance of this endeavour within the university’s vibrant campus culture, CHDN approached the task with meticulous attention to detail and a commitment to delivering excellence at every stage of the process.
Relocation of Cranes
CHDN recently worked alongside S.J. Cheesman Engineering with the removal of two Cranes from the Leigh Creek coalmine. They were Re-installed in S.J. Cheesman’s workshop in Port Pirie.