Cheeseman's Crane Relocation
CHDN recently worked alongside S.J. Cheesman Engineering with the removal of two Cranes from the Leigh Creek coalmine. They were Re-installed in S.J. Cheesman’s workshop in Port Pirie.
This project included:
- Safely disconnecting the electrical power supply to the crane, ensuring all electrical connections are properly isolated and secured.
- Removal of electrical components, ensuring proper labelling and documentation for reinstallation if necessary.
- De-energisation procedures to eliminate any residual electrical energy within the crane system, ensuring the safety of personnel involved in the removal process.
- Adhering to safety regulations and standards to prevent electrical hazards during the removal process, including proper grounding and personal protective equipment (PPE) usage.
- Proper disposal or relocation of electrical components in accordance with environmental regulations and project requirements.
- Documentation of the electrical removal process, including records of disconnection procedures, equipment removal, and any modifications made to the electrical system of the crane.
- Safely reconnecting the electrical power supply to the crane, ensuring all connections are properly secured and tested.
- Installation of electrical components: following proper labelling and documentation for accurate reinstallation.
- Energisation procedures, ensuring all safety measures are in place to protect personnel and equipment.
- Testing and commissioning of the electrical system to verify proper functionality and compliance with safety standards.
- Final inspection to ensure all electrical connections are secure and the crane is ready for operation.
- Documentation of the reconnection process, including records of installation, testing, and commissioning procedures for future reference and maintenance