Bitumen Plant

CHDN actively assisted Topcoat throughout the entirety of establishing and activating their bitumen plant. Post-installation, CHDN remains committed to delivering ongoing maintenance services. 

This project included:

  • Extensive assistance during installation to ensure a smooth setup process.
  • Ensured proper assembly and integration of all components for efficient operation.
  • Close collaboration with Topcoat during the commissioning phase.
  • Verified that the plant met performance standards and regulatory requirements.
  • Ensured all systems were functioning optimally before full operation.
  • Regular inspections conducted to identify any potential issues.
  • Repairs and adjustments made as needed to sustain the plant’s optimal functionality over time.
  • Provide continuous support and expertise to ensure Topcoat’s mobile bitumen plant remains operational and productive.

The project was completed on schedule and with minimal disruption to site operations