Bitumen Plant
CHDN actively assisted Topcoat throughout the entirety of establishing and activating their bitumen plant. Post-installation, CHDN remains committed to delivering ongoing maintenance services.
This project included:
- Extensive assistance during installation to ensure a smooth setup process.
- Ensured proper assembly and integration of all components for efficient operation.
- Close collaboration with Topcoat during the commissioning phase.
- Verified that the plant met performance standards and regulatory requirements.
- Ensured all systems were functioning optimally before full operation.
- Regular inspections conducted to identify any potential issues.
- Repairs and adjustments made as needed to sustain the plant’s optimal functionality over time.
- Provide continuous support and expertise to ensure Topcoat’s mobile bitumen plant remains operational and productive.
The project was completed on schedule and with minimal disruption to site operations